The JR team created an effective assembly solution by integrating several different assembly processes and part handling methods which decreased cycle time, reduced labor content and floor space, and improved part quality over the customer's existing stand alone assembly cells.
To assemble and test right and left hand fabric covered sun visors on a single assembly system with minimal operator contact and a 15 second cycle time. Cleanliness is important to avoid staining the light colored fabric.